NR NR/L3/ELP/27240/NR/DIST C16L ISSUE 3 PDF

NR NR/L3/ELP/27240/NR/DIST C16L ISSUE 3 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16L ISSUE 3 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Isolation and Earthing of Isolation Transformers, Associated Cables and Equipment at West London Junction, Mitre Bridge Junction and Scrubs Lane

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
NR/L3/ELP/27240/NR/DIST C16L

Includes: The following instructions apply only to the isolation transformers and their associated equipment at West London Junction I.T.S.L., Mitre Bridge Junction, and Scrubs Lane installations and relate to the procedures detailed in NR/SP/ELP/21067 to be carried out in connection with the making out and cancelling of Permits to Work and Sanctions for Test for high voltage apparatus.

Excludes: Isolation and earthing instructions for the Structure Mounted Outdoor Switchgear at West London Junction is covered by NR/DIST C16f


Edition : 3
File Size : 1 file , 91 KB
Number of Pages : 6
Published : 03/01/2017

History


Related products

NR BRS-SM 2021 ISSUE B
Published Date: 12/01/1993
Colour Light Signals Rail for Use with Straight or Cranked Stanchions
$5.7
NR BR 921 ISSUE 3
Published Date: 03/01/1977
Electrical Measuring Instrument for S & T Technicians
$13.2
NR RT/CE/S/222 ISSUE 1
Published Date: 02/01/1999
Requirements for the Management of Bridge Strikes
$24.3
NR X70030 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Barrier Control Circuits (1), for Level Crossings located within an interlocked area
$5.7

Best-Selling Products

LAN Technologies Explained
Published Date: 04/01/2000