Name:
NR NR/L3/ELP/27240/NR/DIST C16L ISSUE 3 PDF
Published Date:
03/01/2017
Status:
[ Active ]
Publisher:
Network Rail
Includes: The following instructions apply only to the isolation transformers and their associated equipment at West London Junction I.T.S.L., Mitre Bridge Junction, and Scrubs Lane installations and relate to the procedures detailed in NR/SP/ELP/21067 to be carried out in connection with the making out and cancelling of Permits to Work and Sanctions for Test for high voltage apparatus.
Excludes: Isolation and earthing instructions for the Structure Mounted Outdoor Switchgear at West London Junction is covered by NR/DIST C16f
| Edition : | 3 |
| File Size : | 1 file , 91 KB |
| Number of Pages : | 6 |
| Published : | 03/01/2017 |