NR NR/L3/ELP/27240/NR/DIST C16M ISSUE 3 PDF

NR NR/L3/ELP/27240/NR/DIST C16M ISSUE 3 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16M ISSUE 3 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Isolation and Earthing at Old Oak Common Feeder Station No 1 Including Cables to North Pole Depot and Interconnector Cables to Old Oak Common Feeder Station No 2 and Acton Lane and Their Isolators

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
NR/L3/ELP/27240/NR/DIST C16M

Includes: The following instructions apply to all equipment including cables to North Pole Depot transformers at Old Oak Common F.S. No. 1, the duplicate interconnection cables to Old Oak Common F.S. No. 2 together with the associated double pole isolator and C.B. and the duplicate Interconnecting cables to Acton Lane F.S. together with the associated double pole isolators and earthing switches, and relate to the procedures detailed in NR/SP/ELP/21067 to be carried out in connection with the making out and cancelling of Permits to Work and Sanctions for Test for H.V.


Edition : 3
File Size : 1 file , 130 KB
Number of Pages : 13
Published : 03/01/2017

History


Related products

NR NR/L2/SIG/11766/A020 ISSUE 4
Published Date: 06/04/2016
Aster and Aster21 Track Circuit Manual: Aster21 Track Circuit Application Manual
$18.6
NR NR/CIV/SD/2067 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m External Unit Right Skew 45⁰
$5.7
NR RT/E/G/11730 ISSUE 2
Published Date: 06/01/2002
Signalling Works Testing (aka NR/GN/SIG/11730)
$18.6
NR NR/L1/OHS/210 ISSUE 1
Published Date: 03/04/2017
Management of Occupational Road Risk Policy
$13.2

Best-Selling Products