NR NR/L3/ELP/27240/NR/DIST C22X ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C22X ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C22X ISSUE 1 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Routine Maintenance of ABB ZX1.1 and ZX1.2 Gas Insulated Switchgear

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C22X

Includes: ABB ZX1.1 & ZX1.2 Gas insulated Switchgear installed in DC electrification networks.


Edition : 1
File Size : 1 file , 55 KB
Number of Pages : 2
Published : 03/01/2017

History


Related products

NR X31050 ISSUE 2
Published Date: 02/05/2000
AOCL Typical Circuits Directional Control Circuits Single Line
$5.7
NR NR/L2/SIG/30014/B410 ISSUE 2
Published Date: 06/02/2012
Signalling Works Testing Staff Competence Assessment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/CIV/SD/4402 ISSUE A
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Design Brochure
$18.6
NR NR/CIV/SD/1456 ISSUE D
Published Date: 12/01/2018
D-Type Underbridges: Protective Treatment: Steel Floor Sheet 1 of 2
$5.7

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1