NR NR/L3/ELP/27240/NR/DIST C26L ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C26L ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C26L ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Routine Testing of D.C. Frame Leakage Protection - Whipp & Bourne MM74

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
NR/L3/ELP/27240/NR/DIST C26L

Includes: There are three main generations of the MM74 switchboards. This instruction describes how to test D.C. frame leakage protection installed

on Whipp & Bourne 2nd and 3rd generation. Stage 1 and stage 2 are tested separately however a single test may be undertaken if agreement

is reached with the ECR.


Edition : 1
File Size : 1 file , 330 KB
Number of Pages : 6
Published : 12/05/2020

History


Related products

NR RT/E/P/10025 ISSUE 3
Published Date: 12/01/2001
IECC Timetable Processor Edit Facilities User Guide (aka NR/SP/SIG/10025)
$24.3
NR BRS-SM 2483
Published Date: 09/07/1995
HW & 63 Electric Point Machines General arrangement R.H. Switch Diamond on Concrete 113A Stock Rail, UIC-54B Switch Rail
$5.7
NR NR/L3/XNG/309 ISSUE 1
Published Date: 09/05/2020
Level Crossing Administration
$13.2
NR T25230 ISSUE 3
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points Clamp Lock Mk2. Detection Circuits Using Dowmic Switches Not for New Work.
$5.7

Best-Selling Products

TFF 100/107
Published Date: 2002
TEST
TFF 108
Published Date: 1993
TEST
TFF 109/510
Published Date: 1999
TEST
TFF 110
Published Date: 12/20/1986
TEST
TFF 110
Published Date: 2003
TEST
TFF 111
Published Date: 2002
TEST