Name:
NR NR/L3/ELP/27240/NR/DIST C26P ISSUE 1 PDF
Published Date:
12/05/2020
Status:
[ Active ]
Publisher:
Network Rail
Includes: This instruction describes how to test D.C. frame leakage protection installed on Siemens 8MF94 1st generation switchboards. These
switchboards are fitted with second stage frame leakage. It follows the existing work instruction methodology that tests stage 1 and stage 2
separately however a single test may be undertaken if agreement is reached with the ECR.
Excludes: All other types of frame leakage protection
| Edition : | 1 |
| File Size : | 1 file , 280 KB |
| Number of Pages : | 6 |
| Published : | 12/05/2020 |