NR NR/L3/ELP/27240/NR/DIST C33H ISSUE 2 PDF

NR NR/L3/ELP/27240/NR/DIST C33H ISSUE 2 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C33H ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Active ]

Description:

Maintenance of 25kV Track-Side Driescher Motor Operated Switch (MOS) and Circuit Main Earth (CME)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
NR/L3/ELP/27240/NR/DIST C33H

Includes: Track-side 25 kV A.C. Motor Operated Driescher Fla 15/97-1B Load Break Switch and FES 25-16-1B Earthing Switch


Edition : 2
File Size : 1 file , 530 KB
Number of Pages : 12
Published : 03/02/2019

History


Related products

NR BRS-SM 52591
Published Date: 02/13/1995
Parts Schedule for Mechanical Backdrive External to 4' on R.H.S Full Depth CV Layout Point Machine Mounted on L.H.S
$5.7
NR NR/L3/TRK/003 ISSUE 43
Published Date: 06/03/2023
Index of Track Engineering Forms
$18.6
NR NR/L3/ELP/27240/NR/DIST C10H ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection testing of F.G.L Instantaneous Attracted Armature Relay
$5.7
NR TEF 3291 ISSUE 3
Published Date: 12/04/2021
Critical Rail Temperature Assessment Form 4 for Jointed Track Sites
$5.7

Best-Selling Products

LPI 175
Published Date: 01/01/2008
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2008 Edition
LPI 175
Published Date: 2011
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2011 Edition
$14.7
LPI 175
Published Date: 2014
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2014 Edition
$14.7