NR NR/L3/ELP/27240/NR/DIST C34B ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C34B ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C34B ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Isolation of the AC/DC Interface Trackside Slave Contactor (TSC) Panels

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C34B

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation to place the

Trackside Slave Contactors (TSC) at Blackfriars station (see figure 1) to enable maintenance work / testing to be carried out.

Excludes: These instructions do not include the methodology of isolating the main DC contactor suites at Ludgate Cellars Substation, that operate the

Trackside Slave Contactors (TSC).


Edition : 1
File Size : 1 file , 160 KB
Number of Pages : 4
Published : 12/05/2020

History


Related products

NR BRS-SM 631/8 ISSUE E
Published Date: 04/30/1992
Temporary Speed Restriction Warning Arrangements Skirt Plate for Normal Strength Magnet Support
$5.7
NR NB 099 ISSUE 1
Published Date: 07/01/2010
Changes to NR/L2/SIG/10047 Issue 12 (Management of Safety Related Reports for Signalling Failures)
$5.7
NR NR/L3/MTC/RCS0216/TK44 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Stone Blowing - Hand Held
$5.7
NR BRS-SM 3283 ISSUE A
Published Date: 09/10/2015
IBCL Operated Point Layout with Tubular Stretcher Bars - NR56 SGVS switches - Mechanical Supplementary Drive Mounted in 4 Foot
$5.7

Best-Selling Products