NR NR/L3/ELP/27240/NR/DIST C34D ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C34D ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C34D ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Routine Maintenance of the AC/DC Interface Programmable Logic Controller (PLC) at Ludgate Cellars Substation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C34D

Includes: This document details the routine maintenance to be carried out on the Programmable Logic Controller (PLC) for the main D.C. Contactors at

Ludgate Cellars Substation (see figure 1).

Excludes: These instructions do not include the routine maintenance of either the main D.C. Contactors at Ludgate Cellars Substation or the Trackside

Slave Contactors (TSC) at Blackfriars station.


Edition : 1
File Size : 1 file , 170 KB
Number of Pages : 4
Published : 12/05/2020

History


Related products

NR X72050 ISSUE 3
Published Date: 12/05/2009
MCB Typical Circuits (CCTV Only) CCTV Transmitter Power and Earthing Details
$5.7
NR NR/L3/TRK/002/D08 ISSUE 1
Published Date: 08/01/2007
Piped Drainage & Catchpit Maintenance
$5.7
NR NR/L3/SIG/30082/010 ISSUE 1
Published Date: 12/04/2010
Design and Application Rules - Thales Axle Counter Systems
$18.6
NR T34010 ISSUE 6
Published Date: 02/02/2002
Lineside & on Track Equipment Typical Circuits TPWS - Control Circuits for Retro Fitment to Relay Operated Signalling where Arrangements for the Avoidance of Self Reversion are Necessary
$5.7

Best-Selling Products

Fiberboard Manufacturing Practices
Published Date: 02/01/1991
$19.5