Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation of Rectifiers R3,
R4, R5 & R6 at Ludgate Cellars Substation to enable maintenance work / testing to be carried out.
Excludes: These instructions do not include the methodology of isolating the main D.C. contactor suites at Ludgate Cellars Substation or the Trackside
Slave Contactors (TSC).