NR NR/L3/ELP/27720 ISSUE 1 PDF

NR NR/L3/ELP/27720 ISSUE 1 PDF

Name:
NR NR/L3/ELP/27720 ISSUE 1 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Test Before Touch for Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
CONTAINS NR/BS/LI/490

This standard applies to Overhead Line Equipment only.

This standard applies to Network Rail personnel and contractors working on the operational railway with overhead electrification where an Overhead Line Permit to Work is issued as part of an isolation.

It covers planned work, short notice work and emergency scenarios i.e. work required following an Emergency Switch Off.

This standard excludes:

• work covered by an Overhead Line Permit to Work where it is not planned to touch a conductor (as defined in clause 3);

• Test Before Earth;

• when an isolation is being set up such that it can be shortened back later, the initial tests required to prove that the shorter section is de-energised before the initial wider isolation is implemented;

• insulated conductors e.g. high voltage cables;

• aerial earth wires;

• return conductors;

• local (depot) isolations; and

• OLE that is under construction (i.e. not capable of being energised).

To provide a consistent approach for working and managing the interfaces between systems and parties, other Railway Group members may, as best practice, apply this standard to infrastructure they control within or adjacent to Network Rail’s own infrastructure.

NOTE: The term Overhead Line Permit to Work, sometimes referred to as a Form C, will be referred to as the Overhead Line Permit and abbreviated to OLP in the main body of this document.

Purpose

This standard documents the requirements for planning and implementing Test Before Touch actions for Overhead Line Equipment (OLE). It provides information to enable Test Before Touch actions to be identified, implemented, witnessed and recorded in a consistent manner.

It also provides requirements and guidance on when and where Test Before Touch actions are required.

Compliance with this standard will mitigate the risks of electric shock resulting from inadvertent contact with Live OLE.


Edition : 1
File Size : 2 files , 4.8 MB
Number of Pages : 25
Published : 09/03/2022

History


Related products

NR NR/CIV/SD/1562 ISSUE C
Published Date: 12/03/2016
E-Type Underbridges: Concrete & Reinforcement Details: Concrete Details 0 to 25 Degrees Filler Beam Floor
$5.7
NR NR/GN/OHS/00150 ISSUE 3
Published Date: 03/07/2009
Infection Control
$18.6
NR E10000/94/4 ISSUE A
Published Date: 07/01/1984
Power Supply - Castle Cary Int Power Supply (B/N50)
$5.7
NR NR/L3/SIG/11303/1B05 ISSUE 2
Published Date: 09/04/2010
Signalling Installation Safety: Introduction
$13.2

Best-Selling Products