NR NR/L3/ELP/29987/MOD02 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD02 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD02 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Assessment of Electrical Risks

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for the assessment of the risk of danger arising from live overhead line equipment, and live pantographs and other roof-mounted electrical equipment on trains, when work is to be carried out on or about 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train Module Y).

Purpose

This module provides a consistent approach to the assessment of risks when working on or about 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16)


Edition : 5
File Size : 1 file , 240 KB
Number of Pages : 7
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD02 ISSUE 6
Published Date: 06/04/2022
Working On or About 25 kV A.C. Electrified Lines: Assessment of Electrical Risks
$7.5
NR NR/L3/ELP/29987/MOD02 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Assessment of Electrical Risks
$7.5

Related products

NR BRS-SM 52483
Published Date: 09/07/1995
HW & 63 Electric Point Machines Parts Schedule For Switch Diamonds R.H. On Concrete 113A Stock. UIC-54B Switch Rail
$5.7
NR X22070 ISSUE 2
Published Date: 02/05/2000
ABCL Typical Circuits Control Circuits (3) Double Line Bi-Directional
$5.7
NR NR/L2/TRK/3038/03 ISSUE 2
Published Date: 12/02/2023
Longitudinal Bearer Systems - Inspection, Maintenance and Design: Survey, Design and Replacement of a Longitudinal Bearer System
$13.2
NR BRS-SM 691 ISSUE A
Published Date: 06/09/1982
Track Circuit Cable Clips General Assembly for Fixing to Concrete Sleepers
$5.7

Best-Selling Products