NR NR/L3/ELP/29987/MOD03 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD03 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD03 ISSUE 6 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Management of Electrical Risks

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for the management of the electrical risks involved when work is to be carried out on or about 25 kV a.c. electrified lines in order to prevent danger arising from live overhead line equipment, and live pantographs and other roof-mounted electrical equipment on trains.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to the management of risks when working on or about 25 kV a.c. electrified lines. 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 6
File Size : 1 file , 220 KB
Number of Pages : 12
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD03 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Electrical Risks
$13.2
NR NR/L3/ELP/29987/MOD03 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Management of Electrical Risks
$13.2

Related products

NR NR/L2/TRK/038/01 ISSUE 3
Published Date: 09/04/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits: Train Borne Recording
$7.5
NR T60161 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Right Away Indicator Acc: Electronic Interface (Pot/Laps) Peripheral Location Circuit
$5.7
NR NR/L2/SIG/30014/D115/DT3-13 ISSUE 4
Published Date: 03/03/2018
Signalling Works Testing Handbook: Defined Function Test - Strap and Function Test
$5.7
NR NR/L2/SIG/11201/MOD X39 ISSUE 2
Published Date: 03/06/2021
Signalling Design Handbook: System Application Specification for Overlay Miniature Stop Light Level Crossings
$13.2

Best-Selling Products

ISO/CD 10360-1
Published Date: 05/27/1997
Geometrical Product Specifications (GPS) - Coordinate Measuring Machines - Part 1: Terms and Definitions - DRAFT
$4.5
ISO/CD 13447
Published Date: 12/22/1994
Sampling plans for audit sampling
$3.9
ISO/CD 13623
Published Date: 03/31/1995
Petroleum and Natural Gas Industries - Pipeline Transportation Systems - DRAFT
$31.2
ISO/CD 13656
Published Date: 08/29/1996
Graphic Technology and Photography -- Application of Reflection Densitometry and Colorimetry to Process Control in the Graphic Arts Measurements
$6.6