NR NR/L3/ELP/29987/MOD07 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD07 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD07 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
CONTAINS NR/BS/LI/457

This module states the requirements for the isolation, testing and earthing of overhead line equipment and the issue of overhead line permits on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

Compliance with this module will promote safe operation of the 25 kV a.c. electrification system and produce consistent implementation of secure isolation procedures.

NOTE: Further requirements for working on or about the electrified lines and for communication are contained in the Rule Book Modules AC, Handbook HB16 and G1 (GE/RT8000/AC, GE/RT8000/HB16 and GE/RT8000/G1).


Edition : 5
File Size : 1 file , 3.5 MB
Number of Pages : 99
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD07 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment
$24.3
NR NR/L3/ELP/29987/MOD07 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment
$24.3
NR NR/L3/ELP/29987/MOD07 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment
$24.3
NR NR/L3/ELP/29987/MOD07 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment
$24.3
NR NR/L3/ELP/29987/MOD07 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Overhead Line Equipment
$24.3

Related products

NR NR/L3/MTC/RCS0216/SIG01 ISSUE 3
Published Date: 06/01/2013
Risk Control Manual: Working on Signals (Semaphore and Coloured Light), Includes working on Signal Post, and Gantry
$5.7
NR BRS-SM 882/13
Published Date: 07/13/1988
Fibre Optic Theatre Indicator Stop-Cover
$5.7
NR T25360 ISSUE 1
Published Date: 12/07/1995
Lineside & on Track Equipment Typical Circuits Points - Machine Applications (1)
$5.7
NR NR/L3/SCO/313/SP-1.08 ISSUE 5
Published Date: 06/05/2021
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Competence Standards
$13.2

Best-Selling Products