NR NR/L3/ELP/3091/MODH ISSUE 1 PDF

NR NR/L3/ELP/3091/MODH ISSUE 1 PDF

Name:
NR NR/L3/ELP/3091/MODH ISSUE 1 PDF

Published Date:
09/07/2019

Status:
[ Active ]

Description:

DC Conductor Rail Electrified Lines Working Instructions: Working on DC Track Feeder Cables and Equipment Connected Between the Track Circuit Breaker and the Conductor Rail

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module provides guidance on the circumstances under which a DC Circuit Breaker Withdrawal (Rack Out) form for work on DC track feeder cables and associated switches is required.

This module is applicable to Network Rail personnel and Network Rail’s contractors.


Edition : 1
File Size : 1 file , 520 KB
Number of Pages : 8
Published : 09/07/2019

History


Related products

NR BRS-SM 2370/2&8 ISSUE B
Published Date: 02/20/1996
Mechanical Supplementary Drive Mounted External to 4' for UIC-54B DVS Layout Clamp Lock or Point M/C Operated
$5.7
NR NR/L3/OCS/044/MS-35 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: Station Equipment Monitoring
$5.7
NR BRS-SM 2477 ISSUE B
Published Date: 08/08/2006
Mechanical Supplementary Drives Crank Base For CEN56EI/CEN56EI (113A FD) Layouts on Concrete and Timber Bearers
$5.7
NR BRS-SM 52346 ISSUE B
Published Date: 02/07/1996
Supplementary Detection Materials Schedule for 113A/UIC54B Switches in 3rd Rail Areas
$5.7

Best-Selling Products

CLIA Final Rules for Quality Systems
Published Date: 01/01/2004