NR NR/L3/ELP/SAI25/02 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/02 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/02 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI): Assessment and Management of Electrical Risk

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This module states the requirements for the assessment and management of the risk of danger arising from exposed Live overhead line equipment, live pantographs and other roof-mounted electrical equipment on trains, related to work on or about Overhead Line Equipment.

This module applies to Network Rail personnel and to Network Rail’s contractors, when working on or about Overhead Line Equipment.

To provide a consistent approach for working and managing the interfaces between systems and parties, other Railway Group members may, as best practice, apply this module to infrastructure they control. 

NOTE: For work planned near to overhead power lines, other than the Overhead Line equipment covered by the scope of this standard, reference should be made to HSE Guidance Note GS6 –Avoiding danger from overhead power lines.

This standard also covers:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z). 

Purpose

This module provides a consistent approach to the assessment and management of electrical risk when working on or about Overhead Line Equipment.

NOTE: The requirements of this module do not alter the requirements of the Rule Book GE/RT8000. Reference should be made to Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16). Reference should also be made to the Network Rail life Saving Rules.


Edition : 1
File Size : 2 files , 8.5 MB
Number of Pages : 66
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/02 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Assessment and Management of Electrical Risk
$24.3
NR NR/L3/ELP/SAI25/02 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Assessment and Management of Electrical Risk
$24.3

Related products

NR NR/L3/CIV/140/212C ISSUE 1
Published Date: 05/01/1997
Model Clause 212C: Installation of New & Renewal of Existing Permanent Way
$13.2
NR TI 161 ISSUE 1
Published Date: 05/24/2011
GETS Electronic Treadle Unit (ETU), Final Function Test of Output Relay
$5.7
NR NR/CIV/SD/107 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Stitching of Longitudinal Cracks in Arches & Tunnel Lining between Brick Spandrel/Voussoir & Arch Barrel
$5.7
NR NR/L3/ELP/27240/NR/DIST C10K ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection Testing of K11 Switchgear LFZP141 OPTIMHO Relay Using the ORTS100 Test Set
$5.7

Best-Selling Products

Rigging Products Handbook
Published Date: 01/01/2002
$7.2