NR NR/L3/ELP/SAI25/07 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/07 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/07 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI): Isolation and Earthing of Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This module states the requirements for the isolation, testing and earthing of overhead line equipment and the issue of overhead line permits on Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled Overhead Line Equipment which abut those controlled by Network Rail.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose 

Compliance with this module will promote safe operation of the Overhead Line Equipment and produce consistent implementation of earthed isolations. 

NOTE: The requirements of this module do not alter the requirements of the Rule Book GE/RT8000. Reference should be made to Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16). 


Edition : 1
File Size : 2 files , 2.1 MB
Number of Pages : 57
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/07 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Isolation and Earthing of Overhead Line Equipment
$24.3
NR NR/L3/ELP/SAI25/07 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Isolation and Earthing of Overhead Line Equipment
$24.3

Related products

NR BRS-SM 60/1 ISSUE A
Published Date: 12/12/1977
Colour Light Signals Guard Rail (Side) for Post Signal Stagings
$5.7
NR NR/CIV/SD/1446 ISSUE E
Published Date: 09/02/2017
D-Type Underbridges: Cross Girder & Trimmer: 0 to 25 Degrees Steel Floor Trimmer Girder
$5.7
NR NR/L3/SIG/0010 ISSUE 3
Published Date: 03/06/2010
Signal Asset Inspection
$18.6
NR BRS-SM 2343/2 ISSUE B
Published Date: 09/19/1994
Supplementary Detection Electric Detector Mounting Plate LH for UIC-54B Switches on Concrete
$5.7

Best-Selling Products

2000 National Construction Estimator
Published Date: 01/01/2000
Basic Plumbing with Illustrations
Published Date: 06/01/1994
Excavation & Grading Handbook
Published Date: 12/01/1987
Pipe & Excavation Contracting
Published Date: 10/01/1987