NR NR/L3/ELP/SAI25 ISSUE 2 PDF

NR NR/L3/ELP/SAI25 ISSUE 2 PDF

Name:
NR NR/L3/ELP/SAI25 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI) - (For Early Deployment in North West and Anglia Routes)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Note: 

Please note that there is no Module 3 in the NR/L3/ELP/SAI25 suite of standards. This is deliberate and as a consequence of Module 2 now containing content on both the assessment and management of electrical risks.

This standard applies only in North West and Anglia Routes undertaking the deployment of the Single Approach to Isolations. Within the deployment areas, this standard supersedes all requirements of NR/L3/ELP/29987. For all areas not involved in the deployment, this standard does not apply and the provision of the most recent issue of NR/L3/ELP/29987 apply instead.

This standard applies to all those required to work on Overhead Line Equipment, or so near to them that danger might arise, including persons who:

a) assess electrical risk;

b) plan, prepare and implement mitigations of electrical risk such as isolating, earthing, implementing control measures and issuing of formal safety assurance documents;

c) install, test, operate, maintain, repair and dismantle Overhead Line Equipment and traction return systems;

d) use special tools to work on live overhead line equipment; or

e) work on rail vehicles or other equipment within 2.75 metres (9 feet) of overhead line equipment normally energised at 25 kV a.c.;

f) work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to implement a Supplementary Isolation Process (Module X);

g) plan, prepare and implement isolations on 750V d.c. overhead line equipment system (Sheffield Tram Train – Module Y); 

h) plan, prepare and implement isolations on 1500V d.c. overhead line equipment system (Sunderland Metro Systems Operating Area – Module Z).

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control. 

Purpose 

This modular standard sets out a consistent approach to working on or about Overhead Line Equipment in relation to the dangers arising from proximity to live equipment. This overarching standard for the modules provides an introduction to the suite of modules and consistent use of terminology in the application of the standard. 

This standard and each of its modules should be read in conjunction with all other standards relevant to the activity to be undertaken. 

NOTE: Further requirements are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16). 

Compliance with this standard will mitigate the risks of electric shock or equipment damage resulting from uncontrolled approach to, or contact with, live overhead line equipment, high voltage bushings or cable sealing ends or through mishandling of conductors carrying electric traction current. Compliance with this standard will also mitigate the risks of injury or equipment damage resulting from incorrect or uncoordinated installation, testing, operation, maintenance, repair and dismantling of Overhead Line Equipment. 


Edition : 2
File Size : 2 files , 2.4 MB
Number of Pages : 41
Published : 12/02/2023

History

NR NR/L3/ELP/SAI25 ISSUE 3
Published Date: 06/01/2024
Working On or About Overhead Line Equipment (SAI) - (for Early Deployment in North West and Anglia Routes)
$18.6
NR NR/L3/ELP/SAI25 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI) - (For Early Deployment in North West and Anglia Routes)
$18.6
NR NR/L3/ELP/SAI25 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI)
$18.6

Related products

NR NR/L3/ELP/27720/02 ISSUE 1
Published Date: 09/03/2022
Test Before Touch for Overhead Line Equipment: Method 2: Pre-Planned and Pre-Documented Test Before Touch Actions
$13.2
NR BRS-SW 67-9 ISSUE 2
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Simplified Bi-Directional Signalling
$5.7
NR NR/L3/ELP/27240/NR/DIST C10H(A) ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection Testing of F.G.L Instantaneous Attracted Armature Relay on OCBs
$5.7
NR TEF 3220 ISSUE 2
Published Date: 12/01/2020
Form A: Approval in Principle
$5.7

Best-Selling Products

CAN/CGSB 1.100-99
Published Date: 11/01/1999
Interior Flat Latex Paint
Free Download
CAN/CGSB 1.100-99
Published Date: 11/01/1999
Peinture-emulsion mate d'interieur
Free Download
CAN/CGSB 1.104-M91
Published Date: 12/01/1991
Semigloss Alkyd Air Drying and Baking Enamel
Free Download
CAN/CGSB 1.104-M91
Published Date: 12/01/1991
Peinture-email semi-brillante aux resines alkydes sechant a l'air ambiant et au four
Free Download
CAN/CGSB 1.105-M91
Published Date: 12/01/1991
Quick-Drying Primer
Free Download
CAN/CGSB 1.105-M91
Published Date: 12/01/1991
Peinture pour couche primaire a sechage rapide
Free Download