NR NR/L3/INI/P3M/121 ISSUE 1 PDF

NR NR/L3/INI/P3M/121 ISSUE 1 PDF

Name:
NR NR/L3/INI/P3M/121 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Withdrawn ]

Description:

Governance for Railway Investment Projects (GRIP) - Initiating a Project

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the principles to be adopted for, and the roles and responsibilities associated with, initiating a project as part of the GRIP project delivery framework.

This standard is part of the P3M Framework and relates to NR/L1/INI/P3M/100 and NR/L2/INI/P3M/101. It applies to all projects and programmes that require Investment Authority, as defined within IR01, Investment Regulations, and;

a) enhance or renew the operational railway; and / or

b) are carried out in a high street environment, e.g. car park developments.

NOTE 1: IR01, Investment Regulations, is available on Connect. IR01 is an internal document available to staff within Network Rail only and can be accessed via the following hyperlink or can be made available externally on request to [email protected]:

http://connectdocs/NetworkRail/Documents/CorporateServices/Finance/FinancialControl/Investment%20Regulations.pdf

NOTE 2: See the following link for definitions of projects, programmes, and portfolios in Network Rail.

http://oc.hiav.networkrail.co.uk/sites/GRIP/Core%20Documents/P3M%20Definitions.pdf

This information is available externally on request from [email protected].

Purpose

The purpose of this standard is to mandate that all projects define core project management activities for the management of the project and assessment of its overall success.

The outputs produced in accordance with this standard give a source of reference to resources joining the project and other stakeholders with regards to how the project is being managed.

The approach is based on best practice within industries that undertake major infrastructure projects and practice recommended by the major professional bodies. These include the Office of Government Commerce (OGC), the Association of Project Management (APM) and the Chartered Institute of Building (CIOB).

Implementation of this standard will reduce the reputational and financial risk related to the delivery of complex projects.


Edition : 1
File Size : 1 file , 730 KB
Number of Pages : 16
Published : 09/02/2017

History


Related products

NR BRS-SE 95
Published Date: 07/05/1973
COLOUR LIGHT SIGNALS INVERTED TORIC LENS 139mm (12 PRISM RINGS) FOR DOUBLET COMBINATION
$5.7
NR E10000/1/12 ISSUE D
Published Date: 02/01/1982
Signal Control Circuits - Facing Position Light Signals (2)
$5.7
NR BRS-SM 519/4 ISSUE B
Published Date: 09/12/1990
Rail Clamp Point Lock Alignment Block
$5.7
NR NR/L3/OCS/044/MS-03 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: CCTV Management and Operating procedure
$7.5

Best-Selling Products