NR NR/L3/INI/P3M/134 ISSUE 1 PDF

NR NR/L3/INI/P3M/134 ISSUE 1 PDF

Name:
NR NR/L3/INI/P3M/134 ISSUE 1 PDF

Published Date:
12/07/2019

Status:
[ Withdrawn ]

Description:

Quantitative Cost Risk Assessment (QCRA) for Project, Programme and Portfolio Delivery

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ini-p3m-134-issue-1_2760983

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This standard specifies the process for, and the roles and responsibilities of people associated with, conducting a QCRA for projects, programmes and portfolios (P3M) as required by NR/L2/INI/P3M/106.

This standard is part of the project, programme and portfolio (P3M) framework and relates to NR/L2/INI/P3M/106. It applies to all projects and programmed that require

Investment Authority, as defined within IR01, Investment Regulations, and:

a) enhance or renew the operational railway; and / or

b) are carried out in a high street environment, e.g. carpark developments.

 

Purpose

The purpose of this standard is to describe the requirements for conducting a Quantitative Cost Risk Assessment (QCRA).

The purpose of a QCRA is to assess the combined effect of identified risks using computerized statistical modelling techniques to understand overall delivery confidence against cost to inform management response.

QCRA outputs are used to both recommendations to increase the probability of delivering within funding and identify where there may beadverse consequences requiring visibility and/or management by the business.

This standard provides the work instruction to satisfy the requirements of NR/L2/INI/P3M/106.

 

 

 

 

 

 


Edition : 1
File Size : 1 file , 660 KB
Number of Pages : 18
Published : 12/07/2019

History


Related products

NR T25510 ISSUE 1
Published Date: 09/11/1997
Lineside & on Track Equipment Typical Circuits Points Power Points Control and Detection (Machine Type). SSI
5.70 €
NR BRS-SM 695/1
Published Date: 08/01/1996
Train Operated Points Connection Rod
5.70 €
NR NR/CIV/SD/2013 ISSUE B
Published Date: 06/04/2016
Conarch Overbridge: General Arrangement 7.4m Internal Unit Left Skew 30°
5.70 €
NR NR/CIV/SD/1467 ISSUE C
Published Date: 12/03/2016
D-Type Underbridges: Concrete & Reinforcement Details: Concrete Details Square Composite Floor
5.70 €

Best-Selling Products

FIPS FIPS-PUB-0 Notice 1 - Withdrawn
Published Date: 09/01/1997
GENERAL DESCRIPTION OF THE FEDERAL INFORMATION PROCESSING STANDARDS REGISTER (WITHDARWN 9/1/97) (NO S/S DOCUMENT)
7.20 €
FIPS FIPS-PUB-0
Published Date: 11/01/1968
GENERAL DESCRIPTION OF THE FEDERAL INFORMATION PROCESSING STANDARDS REGISTER (WITHDARWN 9/1/97) (NO S/S DOCUMENT)
7.20 €
FIPS FIPS-PUB-1-2 Notice 1 - Withdrawn
Published Date: 07/29/1997
CODE FOR INFORMATION INTERCHANGE (WITH ANSI X3.4-1977) (SUPERSEDING FIPS-PUB-1-1, FIPS-PUB-1-7, FIPS-PUB-1-15, FIPS-PUB-1-35, AND FIPS-PUB-1-36) (NO S/S DOCUMENT) (WITHDARWN 7/29/97)
7.20 €
FIPS FIPS-PUB-100 Notice 1 - Withdrawn
Published Date: 11/18/1998
INTERFACE BETWEEN DATA TERMINAL EQUIPMENT (DTE) AND DATA CIRCUIT-TERMINATING EQUIPMENT (DCE) FOR OPERATION WITH PACKET-SWITCHED DATA NETWORKS (PSDN), OR BETWEEN TWO DTES, BY DEDICATED CIRCUIT (ANSI X3.100)(NO S/S DOCUMENT)
7.20 €
FIPS FIPS-PUB-101 Notice 1 - Withdrawn
Published Date: 02/25/2000
GUIDELINE FOR LIFECYCLE VALIDATION, VERIFICATION, & TESTING OF COMPUTER SOFTWARE (NO S/S DOCUMENT)
7.20 €
FIPS FIPS-PUB-101
Published Date: 06/06/1983
GUIDELINE FOR LIFECYCLE VALIDATION, VERIFICATION, & TESTING OF COMPUTER SOFTWARE (NO S/S DOCUMENT)
11.40 €