NR NR/L3/INI/PG115/PS/015 ISSUE 2 PDF

NR NR/L3/INI/PG115/PS/015 ISSUE 2 PDF

Name:
NR NR/L3/INI/PG115/PS/015 ISSUE 2 PDF

Published Date:
12/04/2010

Status:
[ Inactive ]

Description:

Planning and Programme Controls: Use of Earned Value Reporting in Investment Projects

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This Network Rail standard specifies the process for using Earned Value on specified projects delivered within Investment Projects.

This module is supported by two Guidance Note modules that outline the methodologies and the accepted approaches for the use of Earned Value within Investment Projects and how to use the Primavera planning application in support.

• NR/L3/INI/PG115/PS/016, Earned Value Reporting – Guidance on definitions and acceptable practices;

• NR/L3/INI/PG115/PS/017, Earned Value Reporting – Guidance on set Up and maintenance of Primavera.

This module specifies:

• the roles and responsibilities in implementing Earned Value, who does what and when, including actions required when variances arise;

• the processes that assures the integrity of the information in baselines and for progress and forecasts in and out of the planning system.

Purpose

This standard forms part of the suite of documents comprising the Planning and Programme Controls manual and relates to the use of Earned Value within Investment Projects.


Edition : 2
File Size : 1 file , 420 KB
Number of Pages : 15
Published : 12/04/2010

History


Related products

NR BRS-SM 2373 ISSUE A
Published Date: 01/17/1994
Supplementary Drive Connection Rod Jaw End to 1 1/4" Screwed End 95 Downset & 50 LH Offset
$5.7
NR T28313 ISSUE 1
Published Date: 04/01/2006
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light, Lighting Circuit, 3 Aspect SSI (Dorman LED) R/Y/G
$5.7
NR RT/E/WI/00016 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Remote Control Systems
$18.6
NR X70190 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits 4 Barrier Detection Circuits (1)
$5.7

Best-Selling Products

RIA-A3 R15.05-1-1990 (R1999)
Published Date: 01/01/1999
Evaluation of Point-to-Point and Static Performance Characteristics of Industrial Robots and Robot Systems
RIA-A3 R15.05-2-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Path-Related and Dynamic Performance Characteristics - Evaluation
RIA-A3 R15.05-3-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Reliability Acceptance Testing - Guidelines
RIA-A3 R15.06-1999 (R2009)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Safety Requirements
RIA-A3 R15.06-2012
Published Date: 03/28/2013
Industrial Robots and Robot Systems - Safety Requirements
$97.5
RIA-A3 R15.08-1-2020
Published Date: 12/25/2020
Industrial Robots and Robot Systems - Safety Requirements Part 1: Requirements for the Industrial Mobile Robot
$67.5