NR NR/L3/INV/3001/RIM115 ISSUE 2 PDF

NR NR/L3/INV/3001/RIM115 ISSUE 2 PDF

Name:
NR NR/L3/INV/3001/RIM115 ISSUE 2 PDF

Published Date:
03/03/2012

Status:
[ Withdrawn ]

Description:

Reporting & Investigation Manual: Network Rail and National Safety Authority (ORR) Interface and Liaison Arrangements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This module applies to those health and safety related interfaces and liaison meetings between Network Rail and the ORR identified in the ORR Interface Matrix.

NOTE 1 The ORR's duties as the National Safety Authority will bring them into contact with many people in the company and Network Rail is committed to a professional and positive relationship with the ORR.

NOTE 2 To help deliver a constructive relationship, a regular and structured set of liaison meetings has been established between ORR and Network Rail, the details of which are contained in the ORR Interface Matrix which is available on Network Rail's Portal.

Purpose

To provide for the management of the interface and liaison arrangements between Network Rail and the National Safety Authority (the Office of the Rail Regulator (ORR)), in order that:

a) key contact details (senior and local) are identified within Network Rail and the ORR and these are widely communicated and made available;

b) appropriate action is taken so as to avoid – wherever possible – Prohibition and Improvement Notices and/or the risk of further enforcement action (e.g. a summons); and

c) there is an appropriate awareness and discussion, and sharing of lessons learnt, of concerns raised by the ORR, at Network Rail's Tactical Safety Group (TSG).


Edition : 2
File Size : 1 file , 57 KB
Number of Pages : 7
Published : 03/03/2012

History


Related products

NR BRS-SM 2055 ISSUE C
Published Date: 03/07/1995
Colour Light Signals General Assembly of Signals For 912 Wide Platform with Central Post & Footstep
$5.7
NR NR/L3/OPS/045/5.10 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 5.10: Management of Environmental Arrangements
$7.5
NR NR/SP/BUS/011 ISSUE 5
Published Date: 10/01/2006
Prevention of Damage to & Danger from Surface & Buried Services
$13.2
NR BRS-SM 39 ISSUE A
Published Date: 09/18/1980
Guide for Off-Stop Rod
$5.7

Best-Selling Products

NEMA/MITA CSP 2-2021
Published Date: 2021
Lifecycle Best Practices Framework for Medical Imaging Devices
$14.7
NEMA/MITA DD P1-2019
Published Date: 08/01/2019
White Paper on Understanding the Limited Usefulness of Detector Dose Measurements in Modern Medical X-ray Imaging Equipment
$24.6
NEMA/MITA RMD P1-2019
Published Date: 01/30/2019
White Paper on Considerations for Remanufacturing of Medical Imaging Devices
$14.7
NEMA/MITA RSSTCD 1-2019
Published Date: 2019
White Paper on Radiation Safety Specification and Testing Comparison Document for Medical X-Ray Imaging Devices General Radiography and Fluoroscopy, and Interventional Fluoroscopy
$28.8
NEMA/MITA RSSTCD 2-2020
Published Date: 2020
White Paper on 21 CFR Subchapter J to IEC Comparison Table for Medical X-Ray Imaging Devices Mammography
$30
NEMA/MITA SAC 1-2020
Published Date: 2020
White Paper on Understanding Accountability in Medical Device Servicing
$14.7