NR NR/L3/MTC/MG0043 ISSUE 3 PDF

NR NR/L3/MTC/MG0043 ISSUE 3 PDF

Name:
NR NR/L3/MTC/MG0043 ISSUE 3 PDF

Published Date:
12/01/2008

Status:
[ Inactive ]

Description:

National Core Audit Programme (NCAP) - Maintenance Delivery Unit Audits

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Infrastructure Maintenance Delivery Unit Audits are compliance audits against group and company standards and Network Rail's Health & Safety Management System. Each audit is split into four disciplines; Management Systems, Track, Signalling & Telecomms and Electrification & Plant.

The standard applies to all Infrastructure Maintenance and Engineering resources undertaking Delivery Unit audits and all Delivery Unit staff subject to audit.

Engineering verification is a separate process and is outwith the scope of this standard.

Purpose

This standard establishes the arrangements for the Maintenance Delivery Unit Audits within the National Core Audit Programme (NCAP).


Edition : 3
File Size : 2 files , 500 KB
Number of Pages : 20
Published : 12/01/2008

History


Related products

NR T04310 ISSUE 1
Published Date: 03/01/2014
LINESIDE AND ON-TRACK EQUIPMENT TYPICAL CIRCUITS - TRACK CIRCUITS EBI TRACK 200 TCU - G.A
$5.7
NR RT/ETE/5/4/2
Published Date: 03/17/1998
Arrangement of Continuity Bonding Using 150mmsq Aluminium Cable Terminated with Bi-Metal Bond Heads
$5.7
NR BRS-SM 863/1 ISSUE A
Published Date: 01/27/1987
Apparatus Case Small Door for Yale Lock for Door Assembly with Yale Lock
$5.7
NR SAO-CDR-UG-14 ISSUE 1
Published Date: 08/14/2001
IECC CD-ROM Facility Scheme Designer's Note
$7.5

Best-Selling Products

ACOUSTICS NOISE CONTROL
Published Date: 01/01/1996
$21
Calculus & Analytic Geometry
Published Date: 04/01/1996
$7.2