NR NR/L3/MTC/MG0082 ISSUE 2 PDF

NR NR/L3/MTC/MG0082 ISSUE 2 PDF

Name:
NR NR/L3/MTC/MG0082 ISSUE 2 PDF

Published Date:
06/01/2008

Status:
[ Active ]

Description:

Managing Claims within Maintenance Organisation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This process applies to all personnel who are involved in the reporting, assessment, repair (both temporary and permanent), collation and claims for all third party damage occurring to infrastructure assets.

Purpose

To provide a process so that when damage to the infrastructure is caused by a third party, the incurred cost of remedial work, plant and materials is recorded and collated so that claims can be processed by Network Rail for re-imbursement. Third party incidents are identified from the Route Fault Control Managers Organisation (RFC) log


Edition : 2
File Size : 1 file , 350 KB
Number of Pages : 10
Published : 06/01/2008

History


Related products

NR NR/L3/ELP/3091 ISSUE 6
Published Date: 09/07/2024
DC Conductor Rail Electrified Lines Working Instructions
$18.6
NR TI 010 ISSUE 1
Published Date: 03/01/2005
SSI MPM and PPM Fault Labels
$5.7
NR BRS-ST 90/7
Published Date:
Plate, Spindle, Spindle Sub Assembly Lifting Barrier (Auto) MK II B
$5.7
NR NR/CIV/SD/FORMA/610 ISSUE P3
Published Date: 03/03/2012
Form A: Undertrack Crossing (Open Cut)
$13.2

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants