NR NR/L3/MTC/MG0176 ISSUE 7 PDF

NR NR/L3/MTC/MG0176 ISSUE 7 PDF

Name:
NR NR/L3/MTC/MG0176 ISSUE 7 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Ellipse Work Management Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This manual specifies the business rules for the functional use of Ellipse and how these are to be applied by users throughout Network Rail.

The manual is subdivided into the modules shown in table 1 for ease of use and reference.

Purpose

Ellipse is Network Rail’s primary asset register and Maintenance Work Management system. It is used by the Maintenance function to record details  of cyclic tasks, work arising and other work.

The information held in Ellipse and the way it is used helps Network Rail to:

a)  maintain accurate information about its assets;

b)  maintain the infrastructure as efficiently as possible;

c)  plan work in the most efficient manner;

d)  identify what work needs to be done and when;

e)  group different work activities so they can be carried out with minimal disruption to train service;

f)   look forward to future work and use it to plan resources to:

   1)  make best use of their  time;

   2)  plan their activities to be carried out in the safest way. Ellipse is used for five key purposes:

a)  as an asset register;

b)  as a work bank management tool;

c)  as a means of scheduling  work and allocating  it resources;

d)  as a record of work carried out;

e)  to record asset condition and associated condition monitoring data.

Accurately recorded completed work provides a history of the assets’ performance. This is used to support renewals plans so that the right mix of maintenance,

refurbishment and renewal is carried out.


Edition : 7
File Size : 1 file , 570 KB
Number of Pages : 16
Published : 09/04/2021

History

NR NR/L3/MTC/MG0176 ISSUE 9
Published Date: 06/03/2023
Ellipse Work Management Handbook
$13.2
NR NR/L3/MTC/MG0176 ISSUE 8
Published Date: 09/03/2022
Ellipse Work Management Handbook
$13.2
NR NR/L3/MTC/MG0176 ISSUE 7
Published Date: 09/04/2021
Ellipse Work Management Handbook
$13.2
NR NR/L3/MTC/MG0176 ISSUE 6
Published Date: 09/05/2020
Ellipse Management Handbook
$13.2
NR NR/L3/MTC/MG0176 ISSUE 5
Published Date: 03/04/2017
Ellipse Management Handbook
$13.2

Related products

NR NR/L3/CIV/185 ISSUE 3
Published Date: 09/05/2020
Management of Reports of Safety Related Geotechnical Incidents
$13.2
NR BRS-SM 2482
Published Date: 09/07/1995
HW & 63 Electric Point Machines General arrangement L.H. Switch Diamond on Timber 113A Stock Rail, UIC-54B Switch Rail
$5.7
NR NR/L3/MTC/RCS0216/MP11 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Use of OTP with Drainage/Jetting Units
$5.7
NR NR/L2/P3M/201 ISSUE 2
Published Date: 09/03/2022
Project Acceleration in a Controlled Environment (PACE)
$18.6

Best-Selling Products

ALSC PS 20
Published Date: 10/01/2021
American Softwood Lumber Standard
ALSC PS 20
Published Date: 01/01/2005
American Softwood Lumber Standard
ALSC PS 20
Published Date: 06/01/2010
American Softwood Lumber Standard