NR NR/L3/MTC/PL0107 ISSUE 3 PDF

NR NR/L3/MTC/PL0107 ISSUE 3 PDF

Name:
NR NR/L3/MTC/PL0107 ISSUE 3 PDF

Published Date:
06/01/2008

Status:
[ Withdrawn ]

Description:

Planning & Delivery of 25kV Overhead Line Equipment Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-mtc-pl0107-issue-3_2767155

Choose Document Language:
18.60 €
Need Help?
W/D S/S BY NR/L2/OPS/202 * PDF ONLY

This procedure applies to all isolations that are controlled by Network Rail's Electric Control Operator (ECO) by pre-arranged line Block To Electric Trains (BTET), switching off and securing of circuit breakers and section switches to isolate the OLE, the subsequent testing and earthing of the OLE and the issue of an Overhead Line Permit. It also includes the application of or amendment to notice of BTET that either does not require an isolation or needs to remain in force following the relinquishing of an isolation.

It does not include local isolations or isolations carried out under emergency procedures.

This document does not repeat the content of NR/SP/ELP/29987, it defines the process by which Maintenance will deliver compliance. If there is any conflict between interpretation of this procedure and the standard, then NR/SP/ELP/29987 takes precedent.

Purpose

This procedure details the processes so Overhead Line Equipment (OLE) isolations are planned and delivered consistently and in accordance with NR/SP/ELP/29987 "Working on or about 25kV AC electrified lines" and with NR/L2/MTC/PL0056 "Work and possession planning for the railway infrastructure (meetings management pack)".


Edition : 3
File Size : 1 file , 400 KB
Number of Pages : 27
Published : 06/01/2008

History


Related products

NR RT/ETE/1/2/9
Published Date: 03/17/1998
Brecknell Willis Preformed High Speed Ramp Drilled to Accommodate 1000mm. sq. Aluminium Cable Connections. Asc Conductor Rail
5.70 €
NR NR/L3/CIV/140/153C ISSUE 1
Published Date: 05/01/1997
Model Clause 153: Brickwork & Masonry Repairs
18.60 €
NR NR/L2/ELP/27009/MOD C01 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF CAM TYPE 753 COPPER LOOP DROPPERS
5.70 €
NR NR/GN/INI/0301/01 ISSUE 1
Published Date: 03/02/2019
Integrated Engineering Lifecycle for Projects Phase A Supporting Information
13.20 €

Best-Selling Products

ATIS 0100001.2004(S2018)
Published Date: 10/01/2004
User Plane Security Guidelines and Requirements for ETS
18.00 €
ATIS 0100002
Published Date: 07/01/2004
Reliability Aspects of Next Generation Networks
43.50 €
ATIS 0100003
Published Date: 11/01/2004
User Plane Priority Levels for IP Networks and Services
18.00 €
ATIS 0100004
Published Date: 01/01/2006
Availability & Restorability Aspects of Emergency Telecommunications Service (ETS)
33.00 €
ATIS 0100005.2006 (S2016)
Published Date: 05/01/2007
Auditory Non-Intrusive Quality Estimation Plus (ANIQUE+): Perceptual Model for Non-Intrusive Estimation of Narrowband Speech Quality
33.00 €
ATIS 0100006
Published Date: 05/01/2006
Service Restoration Priority Levels for IP Networks
18.00 €