NR NR/L3/MTC/PL0175/04 ISSUE 4 PDF

NR NR/L3/MTC/PL0175/04 ISSUE 4 PDF

Name:
NR NR/L3/MTC/PL0175/04 ISSUE 4 PDF

Published Date:
09/04/2010

Status:
[ Withdrawn ]

Description:

Infrastructure Maintenance Planning Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This module applies to Work Plan Coordinators and Section Planners. It specifies a method of viewing sequencing plans in visible plan to check work plans are optimised. Examples of sequence planning for best practice:

• Integration of existing grinding plans into Delivery Unit work plans

• Engineering train sequencing checks – including UTU trains

• Grinding - includes in-traffic and in-possession grinding trains

NOTE The use of visible plan is not mandatory, however its use is recommended for optimising work planning.

Purpose

This process is used to prepares the work plan for optimising grinding plans .


Edition : 4
File Size : 1 file , 21 KB
Number of Pages : 3
Published : 09/04/2010

History


Related products

NR NR/EPF/LV/003 ISSUE 2
Published Date: 09/03/2011
Uninterruptible Power Supply (UPS) Record Sheet (aka EPF/LV/003)
$5.7
NR E10000/12/12 ISSUE B
Published Date: 10/01/1991
Axle Counter Local Power Supply for Feeding One or Two Detection Points
$5.7
NR RT/CE/C/039 ISSUE 2
Published Date: 12/01/2003
Formation treatments
$18.6
NR NR/L2/OHS/0047/TB ISSUE 1
Published Date: 06/06/2015
Application of the Construction (Design and Management) Regulations to Network Rail Construction Projects - Technical Briefing
$18.6

Best-Selling Products

ICPA SS-1-2001
Published Date: 01/01/2001
Performance Standard for Solid Surface Materials
$12