NR NR/L3/MTC/PL0179 ISSUE 1 PDF

NR NR/L3/MTC/PL0179 ISSUE 1 PDF

Name:
NR NR/L3/MTC/PL0179 ISSUE 1 PDF

Published Date:
06/01/2008

Status:
[ Withdrawn ]

Description:

The Planning of 650/750V DC Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This procedure applies to all isolations that are controlled by Network Rail's Electric Control Operators (ECOs). Isolations are pre-arranged blockages of the line to electric trains (BTET), switching off and securing of circuit breakers and section switches to isolate the conductor rail equipment (CRE), the subsequent testing and earthing of the CRE and the issue of conductor rail permits.

It also includes the application of or amendment of BTET notices that either do not require an isolation or need to remain in force following the relinquishing of an isolation.

It does not include local isolations or isolations carried out under emergency procedures.

This document does not intend to repeat all clauses of the DC Working Instructions. Where there is ambiguity, the DC Work Instructions take precedence over this document.

The process for the delivery of DC isolations is excluded as it is described in detail in the differing DC work instructions for the relevant areas.

Purpose

This procedure details the process to make sure that all DC isolations are planned in accordance with the DC working instructions relevant to the Infrastructure Maintenance area involved and NR/L2/MTC/0056 "Specification for work and possession planning for the railway infrastructure (meetings management pack)".


Edition : 1
File Size : 1 file , 550 KB
Number of Pages : 11
Published : 06/01/2008

History


Related products

NR RT/CE/S/089 ISSUE 1
Published Date: 04/01/2004
Management of Existing Coastal, Estuarine & River Defences (aka NR/SP/CIV/089)
$18.6
NR BRS-SM 52561
Published Date: 02/20/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' on R.H.S Full Depth GV Layout Point Machine Mounted on L.H.S
$5.7
NR NR/L2/SIG/30014/D120/TS6-35 ISSUE 5
Published Date: 06/05/2021
Signalling Works Testing: In Bearer Clamp Lock (IBCL) Signalling Works Test Specification
$7.5
NR NR/L3/ELP/27240/NR/DIST C02 ISSUE 5
Published Date: 09/05/2020
Maintenance of HV Feeder Cables and Feeder Cable Routes (Forming the Traction Distribution System)
$5.7

Best-Selling Products

PDI BPSGI
Published Date:
Basic Principles for Sizing Grease Interceptors
PDI G 101
Published Date: 03/01/2010
Testing and Rating Procedure for Hydro Mechanical Grease Interceptors with Appendix of Installation and Maintenance
PDI G 102
Published Date:
Testing and Certification for Grease Interceptors with FOG Sensing and Alarm Devices
PDI GGI-EM
Published Date: 01/01/2010
Guide To Grease Interceptors: Eliminating the Mystery
PDI MGO
Published Date:
Model Grease Ordinance
PDI MSREPFS
Published Date: 01/01/2009
MINIMUMSPACE REQUIREMENTS FOR ENCLOSED PLUMBING FIXTURE SUPPORTS