NR NR/L3/MTC/SE0195 ISSUE 3 PDF

NR NR/L3/MTC/SE0195 ISSUE 3 PDF

Name:
NR NR/L3/MTC/SE0195 ISSUE 3 PDF

Published Date:
03/06/2010

Status:
[ Active ]

Description:

Hand Arm Vibration Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard applies to all staff that carry out maintenance activities which may be affected by the identified hand held tools and machines to the prescribed level laid down in NR/L2/OHS/00113.

This procedure also applies to all Infrastructure Maintenance and Human Resources Managers including the respective Workforce Health Safety and Environment Advisors who have a responsibility to advise employees of the risks of work they are asked to perform.

Purpose

This standard details the process by which Infrastructure Maintenance:

• Assesses the risks to Infrastructure Maintenance function employees performing tasks with hand held tools and machines which have the potential to cause Hand Arm Vibration Syndrome (HAVS) or carpal tunnel syndrome;

• Identifies Infrastructure Maintenance employees affected into the prescribed level of necessary health surveillance;

• Complies with the requirements described in NR/L2/OHS/00113 applied when carrying out health surveillance with Infrastructure Maintenance.

The arrangements in place comply with the requirements of the Control of Vibration at Work Regulations 2005 ("the Regulations"). Implementation of the standard will enable Network Rail to comply with its legal obligations under the Regulations and meet its duty of care to those with an existing condition.


Edition : 3
File Size : 1 file , 530 KB
Number of Pages : 11
Published : 03/06/2010

History


Related products

NR X55210
Published Date: 01/31/1995
MWL Crossing Standards Track Control & JR Circuits : Double Line Uni-Directional with Treadle Only Reset
$5.7
NR BRS-ST 82/5 ISSUE B
Published Date: 11/01/1967
Bearings Half D.B. for Plummer Block Lifting Barrier (Auto) Mk II B
$5.7
NR NR/L3/MTC/RCS0216/TK40 ISSUE 4
Published Date: 03/06/2021
Risk Control Manual: Working with Rail - Jointed, Check and CWR
$5.7
NR SMF/SG/0194 ISSUE 1
Published Date: 02/01/2009
Daily Vehicle Stock Check - Selective Stock List
$5.7

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5