NR NR/L3/NDS/047 ISSUE 21 PDF

NR NR/L3/NDS/047 ISSUE 21 PDF

Name:
NR NR/L3/NDS/047 ISSUE 21 PDF

Published Date:
03/03/2012

Status:
[ Withdrawn ]

Description:

Train Operations Manual - Contents

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This standard provides the index and version control of each individual module within the Train Operations Manual.

The requirements detailed within individual modules apply only to the actions of person competent to work within the relevant environment

Purpose

This standard provides a central reference point of:

a) Information

b) Systems, and

c) Procedural requirements

for all functions with responsibilities associated with the operation of Engineering Trains and On-Track Plant (OTP) within a possession of the line for engineering work on Network Rail managed infrastructure.

Where OTP operations are to be undertaken with Network Rail being recognised as the "Duty Holder", the relevant functional director is required to have in place, appropriate functional procedures which comply with the requirements of this Company Standard.

This standard supports the relevant commitments contained within Network Rail's Health and Safety management System (H&SMS) for the safe operation of Engineering Trains and OTP. The hierarchy from; H&SMS to Company Standards, to functional procedures, to method statements/work package plans/task briefing sheets is illustrated within Figure 1.

A related standard (NR/L3/NDS/048 Train operations manualIndustry mandatory section) is intended for all Network Rail's contractors/suppliers with responsibilities associated with the operation of Engineering Trains and OTP within a possession of the line for engineering work on Network Rail managed infrastructure.

NOTE All persons are reminded that all prescribed safety precautions must be observed when undertaking work activities covered by this Company Standard. Never, under any circumstances, compromise your own personal safety or the safety of others.


Edition : 21
File Size : 1 file , 440 KB
Number of Pages : 14
Published : 03/03/2012

History


Related products

NR NR/CIV/SD/1471 ISSUE C
Published Date: 12/03/2016
D-Type Underbridges: Concrete & Reinforcement Details: Reinforcement Details 0 to 25 Degrees Composite Floor
$5.7
NR RT/ETE/1/2/9
Published Date: 03/17/1998
Brecknell Willis Preformed High Speed Ramp Drilled to Accommodate 1000mm. sq. Aluminium Cable Connections. Asc Conductor Rail
$5.7
NR NR/L3/OHS/005/03/F01 ISSUE 1
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment: Car Park, Near Unfinished or Non-Operational Track and/or to Service Unfinished Station - Diagram
$5.7
NR RT/E/S/40025 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Conveyors
$13.2

Best-Selling Products

APSP 1-1991
Published Date:
Standard for Public Pools
APSP 5-2003
Published Date: 01/01/2003
Standard for Residential Inground Swimming Pools
APSP 6-1992
Published Date: 08/06/1992
Standard for Residential Portable Spas
APSP 7-2006
Published Date: 01/01/2006
American National Standard for Suction Entrapment Avoidance in Swimming Pools, Wading Pools, Spas, Hot Tubs, and Catch Basins
APSP 9-2005
Published Date: 2005
Standard for Acquatic Recreation Facilities