NR NR/L3/NDS/048/TMM001 ISSUE 9 PDF

NR NR/L3/NDS/048/TMM001 ISSUE 9 PDF

Name:
NR NR/L3/NDS/048/TMM001 ISSUE 9 PDF

Published Date:
06/01/2010

Status:
[ Withdrawn ]

Description:

Train Operations Manual - Industry Mandatory Section: Machine/Crane Controller Competence

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

This Procedure applies to:

• Contractor organisation and Agency staff undertaking the duties of On-Track Plant Machine Controller, Crane Controller and Crane Controller Tandem Lifting

• Contractor organisation and Agency staff undertaking the duties of On-Track Machine Crane Controller and On-Track Machine Crane Controller Tandem Lifting

• Licensed Training organisations providing initial training in the duties of Machine Controller, Crane Controller and/or Crane Controller Tandem Lifting

• Licensed Assessment organisations providing competence assessments in the duties of Machine Controller, Crane Controller and/or Crane Controller Tandem Lifting

Purpose

This procedure defines Network Rail's requirements for managing the competence of contractors employees undertaking the duties of Machine Controller, Crane Controller or Crane Controller Tandem Lifting whilst working on its Managed Infrastructure.

Compliance with this Train Operations Manual Procedure is designed to maintain compliance with Network Rails requirements in respect of competence for:

• Machine Controller Crane Controller

• Crane Controller

• Crane Controller Tandem Lifting

This procedure provides a risk-based process to gain and maintain the relevant competence frameworks.

Clarification and guidance on the scheme requirements are available via the NCCA (www.ncca-sentinel.co.uk or telephone 0870 1642244).


Edition : 9
File Size : 1 file , 260 KB
Number of Pages : 32
Published : 06/01/2010

History


Related products

NR NR/L3/MTC/RCS0216/GH03 ISSUE 3
Published Date: 06/07/2014
Risk Control Manual: Biological/Chemical Hazards
$5.7
NR NR/L2/ELP/27715/MOD 05 ISSUE 2
Published Date: 12/02/2023
Overhead Contact System Design Specification: Module 5 Engineering Deliverables
$13.2
NR R03002 ISSUE 2
Published Date: 06/05/1999
Route Relay Interlocking Typical Circuits: Axle Counters Restoration Controls & Indications (2)
$5.7
NR NR/L3/MTC/RCS0216/SP26 ISSUE 1
Published Date: 03/06/2010
Use of Pan Pullers/Frozen Clips
$5.7

Best-Selling Products