NR NR/L3/NDS/302 ISSUE 5 PDF

NR NR/L3/NDS/302 ISSUE 5 PDF

Name:
NR NR/L3/NDS/302 ISSUE 5 PDF

Published Date:
12/04/2010

Status:
[ Withdrawn ]

Description:

Planning of Engineering Access and NDS-Supplied Resource for Work Deliverers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

This standard applies to NDS, responsible for granting and coordinating engineering access and providing resources to Work Deliverers. Resource planning in this document refers to those resources supplied by NDS. It includes the planning of engineering trains for maintenance, renewals and major projects activity but not the timing of these. It does not cover the planning and timing of WTT and amended train services for Network Rail's passenger and freight customers.

This standard does not mandate the detail of how work plans are developed within Network Rail functions. Asset Management – Maintenance (INFRASTRUCTURE MAINTENANCE), Asset Management – Renewals (AM-R) and Investment Projects (IP) have their own detailed work planning standards and process documents, compatible with the timescale and quality requirements contained in NR/L2/NDS/202.

Purpose

This standard describes the principles, key activities, timescales and required work plan information quality applicable to the planning of access and resources to support the delivery of maintenance, renewals and enhancement works on the railway infrastructure. It also describes in detail the responsibilities of NDS planners in the planning process.


Edition : 5
File Size : 1 file , 330 KB
Number of Pages : 43
Published : 12/04/2010

History


Related products

NR NR/CIV/SD/2067 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m External Unit Right Skew 45⁰
$5.7
NR T25406 ISSUE 1
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points - 2 X Spec 998 Detector Circuit Applications Clamp Lock Operated Points
$5.7
NR NR/L3/NDS/308/LMB4.1 ISSUE 1
Published Date: 03/01/2012
YLA Mullet 18.3 m Rails
$5.7
NR NR/CIV/SD/1716 ISSUE C
Published Date: 09/02/2017
Concrete Underbridges: General Arrangements: Pre-Cast Off Site Pre-Stressed Solid Box Beam Deck
$5.7

Best-Selling Products

UL 1004-10
Published Date: 02/28/2020
Standard for Pool Pump Motors
$150.6
UL 1004-1
Published Date: 09/15/2008
Rotating Electrical Machines - General Requirements
UL 1004-1
Published Date: 09/19/2012
Rotating Electrical Machines - General Requirements
$189.3
UL 1004-2
Published Date: 09/15/2008
Impedance Protected Motors
UL 1004-2
Published Date: 01/10/2014
Impedance Protected Motors
UL 1004-3
Published Date: 09/15/2008
Standard for Thermally Protected Motors