NR NR/L3/OCS/043/3.11 ISSUE 2 PDF

NR NR/L3/OCS/043/3.11 ISSUE 2 PDF

Name:
NR NR/L3/OCS/043/3.11 ISSUE 2 PDF

Published Date:
06/04/2011

Status:
[ Withdrawn ]

Description:

National Control Instructions: Response to Remote Condition Monitoring Alarms

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This process applies to all emergency or exceptional circumstance requests for access in order for staff to respond to RCM alarms under the standards listed above. It shall apply to Network Rail employees and contractors.

RCM alerts are dealt with under normal work planning processes and are therefore outside the scope of this process. In addition, the provisions of this process do not apply when it is agreed that the response to an RCM alarm can be dealt with under normal work planning processes.

This process shall apply to Control Office response to RCM alarms generated by various systems. RCM alarms may be received:

Direct to the Control Office via the Intelligent Infrastructure Control Centre system (or an implemented Legacy system).

To a nominated Control Centre Technician.

PURPOSE

In order for Route Controls to have a robust process to manage requests for access from maintenance / engineering staff are required to respond to Remote Condition Monitoring equipment (RCM) alarms in such a way that potential future delay is mitigated or avoided.

To enable Route Controllers to have a robust process to authorise Signallers to grant such access that has been agreed.


Edition : 2
File Size : 1 file , 24 KB
Number of Pages : 3
Published : 06/04/2011

History


Related products

NR TWI 2L004 ISSUE 2
Published Date: 12/01/2014
How to Maintain a Fence
$7.5
NR SMF/SG/0252 ISSUE 1
Published Date: 08/01/2007
Standard Maintenance Form - Request for Independent Technical Investigation
$5.7
NR NR/SIN/199 ISSUE 1
Published Date: 01/21/2021
Safety of Machinery in Network Rail Owned and Operated Depots and Facilities
$13.2
NR NR/L2/SIG/14201 ISSUE 5
Published Date: 12/05/2020
Signalling Risk Assessment Handbook
$7.5

Best-Selling Products

TPI 1
Published Date: 01/01/2022
National Design Standard for Metal Plate Connected Wood Truss Construction
$39.6
TPI ANSI/TPI-1
Published Date: 01/01/2005
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 03/18/2016
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
$37.2
TPI ANSI/TPI-1
Published Date: 02/29/1996
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/15/2011
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/18/2003
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION