NR NR/L3/OCS/043/7.2 ISSUE 6 PDF

NR NR/L3/OCS/043/7.2 ISSUE 6 PDF

Name:
NR NR/L3/OCS/043/7.2 ISSUE 6 PDF

Published Date:
12/01/2012

Status:
[ Withdrawn ]

Description:

National Control Instructions: Seasonal Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

• Autumn instructions including non-operation of track circuits.

• Winter instructions.

• Routes shall issue specific instructions periodically.

PURPOSE

To enable Network Rail Controllers to respond to Seasonal Weather events by following the instructions contained in this instruction and Route issued Seasonal Arrangements.


Edition : 6
File Size : 1 file , 920 KB
Number of Pages : 49
Published : 12/01/2012

History


Related products

NR X82240 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Camera Housing Wiring Details Grundig Camera in New Dennard Housing and Shawley Housing
$5.7
NR BR 1977
Published Date: 11/01/1990
Heatshrink Jointing Kits for use on Flame Retardant Compound Insulated Signalling Cables to BR Specification No 872
$7.5
NR E10001/40 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Facing Position Light Signals (1) (Preset Shunts)
$5.7
NR BRS-SM 374 ISSUE B
Published Date: 08/05/1996
Track Circuit Interrupter Assembly
$5.7

Best-Selling Products

AABC BASIC-PSYCHROMETRICS
Published Date:
TABpro Training Series Video - Basic Psychrometrics
$57.6
AABC BUNDLE
Published Date:
TABpro Training Series Video - Bundle (VAV, Duct Leakage & Psychrometrics)
$224.7
AABC DIRECTORY
Published Date: 01/01/2011
Directory
AABC DIRECTORY
Published Date: 01/01/2012
Directory
AABC DUCT LEAKAGE
Published Date:
TABpro Training Series Video - Duct Leakage and Pressure Decay Testing
$96
AABC KAHOE FIELD MANUAL
Published Date:
Kahoe Test and Balance Field Manual
$45.6