NR NR/L3/OCS/044/GN-03 ISSUE 1 PDF

NR NR/L3/OCS/044/GN-03 ISSUE 1 PDF

Name:
NR NR/L3/OCS/044/GN-03 ISSUE 1 PDF

Published Date:
06/04/2011

Status:
[ Withdrawn ]

Description:

Managed Station Manual: Work Safe Procedure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This procedure applies to all Network Rail Managed Stations employees including temporary staff.

PURPOSE

To make sure that all Managed Stations employees have access to a common process that safeguards themselves and others against carrying out any work that they feel is unsafe. To provide managers and supervisors with a procedure that will deal with a refusal to work.


Edition : 1
File Size : 1 file , 24 KB
Number of Pages : 2
Published : 06/04/2011

History


Related products

NR X31010 ISSUE 2
Published Date: 02/05/2000
AOCL Typical Circuits Layout Single Line
$5.7
NR NR/PS/ELP/21101 ISSUE 2
Published Date: 04/01/2006
Track Cable for DC Electrified Lines (aka NR/SP/ELP/21101)
$13.2
NR NR/L3/INV/3001/RIM106 ISSUE 1
Published Date: 12/03/2011
Reporting & Investigation Manual: Communicating with Outside Parties on Accidents & Incidents
$5.7
NR BRS-SM 440/25 ISSUE B
Published Date: 03/21/1996
Relocatable Equipment Building with Large Battery Room Typical Plan View
$5.7

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants