Name:
NR NR/L3/OPS/043/3.9 ISSUE 2 PDF
Published Date:
03/05/2016
Status:
[ Withdrawn ]
Publisher:
Network Rail
To provide Operational Controllers with robust processes for managing defective rail vehicles, following the activation of Wheel Impact Load Detector (WILD) and instigating the immediate repair of failed Hot Axle Box Detectors (HABD) and WILD monitoring equipment.
PURPOSE
This instruction aims to reduce the potential risk to the network from rail damage caused by vertical wheel impact forces and failed “Intelligent Infrastructure” monitoring equipment.
| Edition : | 2 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 8 |
| Published : | 03/05/2016 |