NR NR/L3/OPS/045/1.02 ISSUE 2 PDF

NR NR/L3/OPS/045/1.02 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/1.02 ISSUE 2 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 1.02: Self-Assurance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-1-02-issue-2_2779054

Choose Document Language:
5.70 €
Need Help?
PDF ONLY

This module applies to operational and station managers who manage safety critical and non-safety critical employees.

PURPOSE

Operational managers in the Routes are required to regularly participate in the self-assurance process with responsibilities and requirements as described within the Health and Safety Management System. Self-assurance requires identified managers to assess their compliance against company standards and controls or develop action plans to address all deficiencies identified as a result of the self-assurance activity.


Edition : 2
File Size : 1 file , 170 KB
Number of Pages : 4
Published : 06/02/2018

History

NR NR/L3/OPS/045/1.02 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 1.02: Self-Assurance
5.70 €
NR NR/L3/OPS/045/1.02 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 1.02: Self-Assurance
5.70 €

Related products

NR BRS-SM 52494
Published Date: 09/07/1995
HW & 63 Electric Point Machine Parts Schedule For Detector Rod Assy (Short) for Switch Diamond
5.70 €
NR BRS-ST 110 ISSUE F
Published Date: 08/11/1977
Signal, Road Warning Flashing Light, Pole Mounted with St Andrew's Cross (for Open Crossing)
5.70 €
NR NR/L3/MTC/RCS0216/MP23 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Use of Vacuum Lifting Device
5.70 €
NR RT/E/C/19259 ISSUE 1
Published Date: 04/01/1998
Signalling Equipment Workshop Engineering Notice (SIGWEN008) Westinghouse Signal Machines (aka NR/GN/SIG/19259)
7.50 €

Best-Selling Products

VDI/VDE/DGQ/DKD 2622 Sheet 10
Published Date: 06/01/2004
Calibration of measurement equipments for electrical quantities - High-frequency fieldstring meters
VDI/VDE/DGQ/DKD 2622 Sheet 11
Published Date: 09/01/2003
Calibration of measurement equipments for electrical quantities - Spectrum analyzers
VDI/VDE/DGQ/DKD 2622 Sheet 12
Published Date: 06/01/2004
Calibration of measurement equipment for electrical quantities - Test receiver
VDI/VDE/DGQ/DKD 2622 Sheet 15.4 - DRAFT
Published Date: 06/01/2007
Draft Document - Calibration of measuring equipment for electrical quantities - Passive measuring equipment for use in EMC-applications - Current clamps
VDI/VDE/DGQ/DKD 2622 Sheet 15.4
Published Date: 05/01/2010
Calibration of measuring equipment for electrical quantities - Passive measuring equipment for use in EMC-applications - Current clamps
VDI/VDE/DGQ/DKD 2622 Sheet 1
Published Date: 01/01/2001
Calibration of measuring equipment for electrical quantities - Fundamentals