NR NR/L3/OPS/045/2.17 ISSUE 1 PDF

NR NR/L3/OPS/045/2.17 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/2.17 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.17: Signalling Location Training Plans

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to managers who are responsible for the creation, review, issue and verification of training plans and managers who are responsible for delivering the local training process.

It applies to all signal boxes, manned level crossings and locations where there are emergency panels.

PURPOSE

This procedure sets out the arrangements for the local training process at signalling locations. It includes requirements for:

  • the production, issue and review of a training plan;

  • the production and implementation of a training timetable / schedule;

  • the completion of the trainee Log Book;

  • the process for completing local training and how it relates to the final assessment of competence


Edition : 1
File Size : 1 file , 330 KB
Number of Pages : 14
Published : 09/02/2017

History


Related products

NR BRS-SM 517/7 ISSUE A
Published Date: 09/12/1990
Rail Clamp Point Lock Packing Plate (Switch Diamonds)
$5.7
NR NR/L3/OCS/044/FS-25A ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Local Document Control Point – Network Rail Managed Stations Document Transmittal Email Template/Sheet
$5.7
NR NR/L3/OCS/044/FS-32A2 ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Crowd Control Plan
$5.7
NR BRS-SE 12
Published Date: 10/21/1958
Fuseholder - Porcelain for BS 714 Cartridge Fuse
$5.7

Best-Selling Products

SN-CEN ISO/ASTM/TS 52930:2021
Published Date: 12/16/2021
Additive Manufacturing - Qualification principles - Installation, operation and performance (IQ/OQ/PQ) of PBF-LB equipment (ISO/ASTM/TS 52930:2021)