NR NR/L3/OPS/045/2.25 ISSUE 1 PDF

NR NR/L3/OPS/045/2.25 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/2.25 ISSUE 1 PDF

Published Date:
01/08/2022

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.25: Rest Break Management Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to signallers and crossing keepers in single-staffed locations. 

PURPOSE 

This procedure sets out the requirements for signallers and crossing keepers to have opportunities for rest breaks when working in single-staffed locations. Such breaks are necessary to contribute to staff physical, mental and social wellbeing and well as to provide opportunities to attend to physical needs. 

Network Rail recognises that for shifts longer than six hours, every worker is entitled to a rest break of not less than 20 minutes, in accordance with the Working Time Regulations (as amended,1998).


Edition : 1
File Size : 1 file , 570 KB
Number of Pages : 11
Published : 01/08/2022

History


Related products

NR NR/L3/ELP/27240/NR/DIST C26E ISSUE 2
Published Date: 03/01/2017
Measurement and Adjustment of "Drop-out" Current for GEC Type RJR High Speed Circuit Breakers
$7.5
NR BRS-SM 239 ISSUE C
Published Date: 08/29/1974
Rail Connection Complete with Fishplate End for F/B Detector Tie Bar
$5.7
NR NR/L2/OHS/00118 ISSUE 4
Published Date: 09/03/2011
Random Testing for Drugs and Alcohol
$13.2
NR NR/L3/MTC/ME0201/CAL297 ISSUE 1
Published Date: 06/07/2008
Calibration of Rhopoint Milliohmmeter Model M210
$5.7

Best-Selling Products