NR NR/L3/OPS/045/3.03 ISSUE 1 PDF

NR NR/L3/OPS/045/3.03 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.03 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.03: Preparation and Distribution of Blocked to Electric Trains (BTET) Instructions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to:

  • BTET instructions being written for signallers and other operational staff on Network Rail managed infrastructure.

  • BTET instructions for any form of electrification (e.g. 25 kv overhead electrification, DC third rail electrification) on Network Rail managed infrastructure.

  • all Network Rail personnel who have a responsibility for preparing, approving, issuing, distributing or briefing of BTET instructions.

  • BTET instructions being supplied for operational staff of sections of railway that interface and / or are operated by third parties where the OHL is managed by Network Rail.

PURPOSE

To provide Network Rail with a process to make sure that Blocked To Electric Trains (BTET) instructions are prepared, authorised, published and briefed in a consistent manner across the network.

NOTE: Blocked To Electric Trains instructions are sometimes referred to as signaller’s isolation instructions. For the purposes of clarity and to avoid confusion with electrical isolation instructions, they should be referred to as Blocked to Electric Trains instructions throughout this document.


Edition : 1
File Size : 1 file , 290 KB
Number of Pages : 12
Published : 09/02/2017

History


Related products

NR T25725 ISSUE 2
Published Date: 03/02/2019
Lineside & on Track Typical Circuits Points - Hy-Drive Electro-Hydraulic Hi-Flow Power Pack MK1
$5.7
NR NR/L2/SIG/30014/D120/TS5-85 ISSUE 5
Published Date: 12/05/2020
Signalling Works Testing Handbook: Track Circuit Interrupter Test Specification (Renumbered from TS5-51)
$5.7
NR NR/L1/SIG/50021/02 ISSUE 2
Published Date: 12/03/2016
Signalling Asset Policy: Technology
$18.6
NR NR/CIV/SD/2145-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Right Skew 15º
$5.7

Best-Selling Products