NR NR/L3/OPS/045/3.05 ISSUE 2 PDF

NR NR/L3/OPS/045/3.05 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/3.05 ISSUE 2 PDF

Published Date:
10/03/2020

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.05: Radio Communication Failures

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-3-05-issue-2_2763801

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This procedure applies to lineside infrastructure failure, fixed terminal failure and cab mobile failure and has been developed to all those using authorised radio systems on Network Rail infrastructure.

It excludes contingency plans for GSM-R cab mobile radio failures. Arrangements for train radio failures are included in train operator specific contingency plans for defective on train equipment produced in accordance with RIS-3437-TOM and RIS-3780-TOM.

It excludes failures in relation to Radio Electric Token Block (RETB) Regulations.

PURPOSE

This procedure gives details and guidance of what to do in the event of radio communication failure to maintain an operational railway. It defines the actions required to be taken by Route Operations Control in respect of GSM-R system failures and planned outages.

The procedure covers the requirements for contingency plans that are in place to:

 a) mitigate any potential impact to trains services resulting from a GSM-R system failure / outage;  

 b) check contingency arrangements are implemented in a consistent manner; and  

 c) allow for local variation to the process through Dynamic Risk Assessment (DRA) (see NR/L3/OPS/045/3.06) and dependent upon the system functionality available.

In areas signalled using ERTMS Level 2, a failure of GSM-R may affect data messages required by the signalling system as well as voice communications.


Edition : 2
File Size : 1 file , 310 KB
Number of Pages : 14
Published : 10/03/2020

History

NR NR/L3/OPS/045/3.05 ISSUE 2
Published Date: 10/03/2020
National Operating Procedure (NOP) 3.05: Radio Communication Failures
13.20 €
NR NR/L3/OPS/045/3.05 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.05: Radio Communication Failures
13.20 €

Related products

NR NR/L3/OCS/044/MS-23 ISSUE 3
Published Date: 06/04/2011
Managed Station Manual: Commercial Filming/Breaking News and Promotions
7.50 €
NR NR/CIV/SD/605 ISSUE C
Published Date: 12/01/2018
Collision Protection Beam: Steelwork Details
5.70 €
NR NR/CIV/SD/2803 ISSUE B
Published Date: 09/02/2017
Modular Overbridge Design: Brick Sandwich Parapet
5.70 €
NR BRS-SM 370/1 ISSUE A
Published Date: 08/12/1970
FPL Bar Fitting (BH Rail) Rail Clip - Type 'A'
5.70 €

Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
160.50 €
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
364.50 €
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
274.50 €
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
157.50 €
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
104.70 €
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
104.70 €