NR NR/L3/OPS/045/3.08 ISSUE 1 PDF

NR NR/L3/OPS/045/3.08 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.08 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Withdrawn ]

Description:

National Operating Procedure (NOP) 3.08: Risk Assessing Level Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-3-08-issue-1_2777877

Choose Document Language:
13.20 €
Need Help?
W/D * PDF ONLY

This process describes a method of risk assessing operational level crossings on Network Rail’s managed infrastructure. It includes:

  • the core level crossing risk assessment process;

  • frequency of risk assessments;

  • use of the All Level Crossing Risk Model (ALCRM) as the risk model;

  • monitoring and response to level crossing incidents and accidents; and

  • level crossing risk records.

It does not apply to authorised walking routes that cross the railway unless they are classified as a staff crossing with white lights. It does not apply to road rail access points or track access points.

A flowchart of the process is shown in Appendix A.

PURPOSE

This procedure provides a process for risk assessing level crossing assets.

It contributes to the control of the following high level risks:

  • Level Crossings: vehicle, person or animal on the line at risk of collision; and

  • Level Crossings – non-collision (with train) incident.

Level crossing risk assessments form part of a multi-disciplinary process that demonstrates that level crossings remain safe, reliable and legally compliant.


Edition : 1
File Size : 1 file , 610 KB
Number of Pages : 20
Published : 09/02/2017

History


Related products

NR NR/L3/ELP/27240 ISSUE 12
Published Date: 06/03/2023
Distribution Work Instructions
13.20 €
NR NR/SP/ELP/21014 ISSUE 2
Published Date: 12/01/2005
Specification of voltage testing electrical distribution equipment (including cables) on a.c. and d.c. electrified lines
18.60 €
NR BRS-SM 691 ISSUE A
Published Date: 06/09/1982
Track Circuit Cable Clips General Assembly for Fixing to Concrete Sleepers
5.70 €
NR NR/GN/CIV/801 ISSUE 3
Published Date: 03/07/2009
The Application of the Observational Approach to the Design of Remedial Works to Earthworks
13.20 €

Best-Selling Products

MEDDEV 13/93
Published Date:
Guidelines Relating to the Application of: The Council Directive 90/385/EEC on Active Implantable Medical Devices and The Council Directive 93/42/EEC on Medical Devices
MEDDEV 2.1/3
Published Date: 03/01/1998
Guidelines Relating to the Demarcation Between 90/385/EEC on Active Implatable Medical Devices, 93/42/EEC on Medical Devices,65/65/EEC Relating to Medicinal Products & Related Directives
MEDDEV 3/94
Published Date: 04/01/1994
Guidelines Relating to the Application of : The Council Directive 90/385/EEC on Active Implantable Medical Devices and The Council Directive 93/42/EEC on Medical Devices