Name:
NR NR/L3/OPS/045/3.11 ISSUE 2 PDF
Published Date:
06/02/2018
Status:
[ Active ]
Publisher:
Network Rail
Network Rail Route Businesses England & Wales and Route Business Scotland staff respond to planned and unplanned events involving the OHL equipment as they are reported and make sure of a timely response and determine the full details and effects of a failure in order to maintain the safety of the operational railway.
This procedure makes sure that any blockage to AC electric trains is effected in a consistent and safe manner.
PURPOSE
This procedure allows both Network Rail’s Route Businesses England & Wales and Route Business Scotland staff to safely deal with isolations affecting the overhead line AC system.
| Edition : | 2 |
| File Size : | 1 file , 240 KB |
| Number of Pages : | 9 |
| Published : | 06/02/2018 |