NR NR/L3/OPS/045/3.26 ISSUE 1 PDF

NR NR/L3/OPS/045/3.26 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.26 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.26: Management of Freight Services During Disruption

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure can apply to all disruptive events (as defined in Part H of the Network Code) regardless of cause. It applies:

a) if Network Rail decides the protocol will facilitate effective service recovery; or

b) where capacity is significantly degraded as a result of the disruptive event.

This instruction provides a process for managing freight services during a disruptive event, or as a consequence of a disruptive event. It provides an opportunity to provide freight services which have yet to commence their journey, but which will be affected by a disruptive event, with an Alternative Train Slot (subject to agreement). The procedure increases the available service management options and therefore provides more effective service recovery from large incidents.

This process delivers greater consistency in the management of freight services affected by disruptive events as well as improving the quality of the action taken and improving service recovery.

This procedure is consistent with the Rights and Obligations of all parties who hold, or are subject to, a Track Access Contract (Freight Services).


Edition : 1
File Size : 1 file , 260 KB
Number of Pages : 7
Published : 09/02/2017

History


Related products

NR RT/ENGP/06 ISSUE 2
Published Date: 12/01/2001
Buildings, Stations & Depots Engineering Policy
$24.3
NR X01605 ISSUE 3
Published Date: 12/01/2008
AHBC Typical Circuits Double Line Bi-Directional where Trains May Stand on the Exit Track Circuit - Circuit Index
$5.7
NR NR/CIV/SD/495 ISSUE A
Published Date: 04/01/2008
Footbridge Access Lifting Point Details Sheet 1 of 2
$5.7
NR BRS-SM 3201 ISSUE A
Published Date: 06/10/2015
Machine Operated Point Layout with Tubular Stretcher Bars - Full Depth BV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7

Best-Selling Products

NS-EN ISO/CIE 11664-1:2019
Published Date: 10/01/2019
Colorimetry - Part 1: CIE standard colorimetric observers (ISO/CIE 11664-1:2019)
NS-EN ISO/CIE 11664-2:2022
Published Date: 11/23/2022
Colorimetry - Part 2: CIE standard illuminants (ISO/CIE 11664-2:2022)
NS-EN ISO/CIE 11664-3:2019
Published Date: 10/01/2019
Colorimetry - Part 3: CIE tristimulus values (ISO/CIE 11664-3:2019)
NS-EN ISO/CIE 11664-5:2024
Published Date: 07/01/2024
Colorimetry - Part 5: CIE 1976 L*u*v* colour space and u', v' uniform chromaticity scale diagram (ISO/CIE 11664-5:2024)
NS-EN ISO/CIE 11664-6:2022
Published Date: 10/19/2022
Colorimetry - Part 6: CIEDE2000 colour-difference formula (ISO/CIE 11664-6:2022)