NR NR/L3/OPS/045/3.32 ISSUE 2 PDF

NR NR/L3/OPS/045/3.32 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/3.32 ISSUE 2 PDF

Published Date:
12/07/2019

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 3.32: Temporary Block Working (TBW) & Emergency Special Working (ESW)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
CONTAINS NR/BS/LI/493

This procedure applies to all employees involved in the planning, execution and checking of Temporary Block Working (TBW) and Emergency Special Working (ESW).

PURPOSE

This procedure sets out the arrangements for pre-planned Temporary Block Working and Emergency Special Working when undertaken in accordance with the Rule Book and Train Signalling Regulations.

The risk of not carrying out these procedures could result in operating irregularities and increased railway undertaking delays occurring.


Edition : 2
File Size : 1 file , 360 KB
Number of Pages : 11
Published : 12/07/2019

History

NR NR/L3/OPS/045/3.32 ISSUE 3
Published Date: 12/02/2023
National Operating Procedure (NOP) 3.32: Temporary Block Working (TBW) & Emergency Special Working (ESW)
$13.2
NR NR/L3/OPS/045/3.32 ISSUE 2
Published Date: 12/07/2019
National Operating Procedure (NOP) 3.32: Temporary Block Working (TBW) & Emergency Special Working (ESW)
$13.2

Related products

NR X32210
Published Date: 02/01/1995
AOCL STANDARDS TRACK CONTROL CIRCUITS ALL DOWN TRAINS STOP, NO SIGNAL (LONG OR UNPREDICTABLE STATION STOP)
$5.7
NR NR/L3/MTC/MG0210 ISSUE 3
Published Date: 06/01/2019
Management of Maintenance Work within a Worksite to Prevent a Possession Overrun
$18.6
NR NR/L3/MTC/RCS0216/OT12 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Maintain Vegetation - Motor Manual Stump Grinding
$5.7
NR NB 190 ISSUE 1
Published Date: 06/05/2020
Siemens Westrace SOM24 Mod States
$5.7

Best-Selling Products

VDI/VDE/DGZfP 2633
Published Date: 10/01/2004
Optical form measurement - System requirements - Standard form