NR NR/L3/OPS/045/3.36 ISSUE 1 PDF

NR NR/L3/OPS/045/3.36 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.36 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.36: Signals Passed at Danger (SPAD) or Signals Passed at RED (SPAR)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to Route Operations Control and the following:

Signals.

Stop boards or Indicators.

Limit of Shunt Signals or Indicators.

Position Light and Shunting signals where the normal aspect means ‘stop’ and the movement is in the direction for which the signal can be cleared.

Possession Limit Boards.

Stop indications given by a hand signaller.

ERTMS End of Authority (EoA) usually indicated by an ERTMS block marker that are passed at danger without authority, on Network Rail Managed infrastructure.

PURPOSE

This National Operating Procedure sets out Network Rail’s incident response to alleged Signal Passed At Danger (SPAD) events. It defines the process for:

a) producing SPAD Alerts;

b) undertaking SPAD Risk Ranking; and

c) managing the production of Multi-SPAD summary briefing information.

It contains details of Signals Passed at Red (SPAR) events and how Network Rail responds to such events.

The procedure makes sure that each SPAD and SPAR is managed in a way which prevents increased or new risks, as well as making sure that they are investigated thoroughly to establish the root cause and prevent reoccurrence.


Edition : 1
File Size : 1 file , 400 KB
Number of Pages : 10
Published : 09/02/2017

History


Related products

NR NR/L2/OHS/019/04 ISSUE 2
Published Date: 06/03/2023
Safety of People at Work on or Near the Line: Module 04 - Planning and Working for High Output and Track Renewals Involving Engineering Trains
$7.5
NR NR/GN/OTK/5000/003 ISSUE A01
Published Date: 06/03/2019
Bow Tie Drainage Management - Exceeding Drainage Capacity of Loss of Function
$5.7
NR NR/L3/MTC/RCS0216/MAT08 ISSUE 2
Published Date: 06/05/2021
Risk Control Manual: Continuous Welded Rail (CWR) Delivery/Recovery by Long Welded Rail Train (LWRT)
$5.7
NR NR/L2/CTM/012/021 ISSUE 1
Published Date: 03/06/2010
Sig 21: Undertake corrective and preventative maintenance of train describer systems
$7.5

Best-Selling Products