NR NR/L3/OPS/045/3.40 ISSUE 1 PDF

NR NR/L3/OPS/045/3.40 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.40 ISSUE 1 PDF

Published Date:
01/09/2021

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.40: Emergency Operation of Signalling Locations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure sets out the requirements for working signalling locations in an emergency situation where an individual does not currently hold location specific signalling competency.

This procedure provides additional options to signalling operations when attempting to keep a signalling location staffed and operational when the national rostering principles have been exhausted.

This procedure applies to all signaling locations Grade 4 and below including level crossing locations where there is a lack of location-specific competent staff available to carry out signalling operations.

The procedure describes the requirements for assessing the suitability of an individual prior to assigning them to work a signalling location in an emergency.

This procedure applies to all signalling staff who hold signalling competency to rules and regulations level 2 or higher.

Purpose

This procedure defines the operational requirements for emergency cover of signalling locations. This process mitigates the risk of closing signalling locations which may have an adverse effect on train performance.


Edition : 1
File Size : 1 file , 380 KB
Number of Pages : 6
Published : 01/09/2021

History


Related products

NR NR/L2/TRK/053/MOD01 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 1: Glossary and Tooling
$13.2
NR NR/L3/ELP/29987 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines
$18.6
NR NR/L3/ELP/27240/NR/DIST C04F ISSUE 3
Published Date: 03/01/2017
Inspection and Maintenance of 25kV Isolating Transformer Return Current Isolating Switches
$5.7
NR NR/L3/SIG/11231C ISSUE 17
Published Date: 06/04/2022
Signal Maintenance Testing Handbook (SMTH) Combined
$130.2

Best-Selling Products

Discovering the Essential Universe
Published Date: 12/01/2000
$10.5
Environmental Chemistry
Published Date: 10/01/1999
$37.2
The Basic Practice of Statistics
Published Date: 07/01/1999
$28.8