NR NR/L3/OPS/045/4.04 ISSUE 1 PDF

NR NR/L3/OPS/045/4.04 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/4.04 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Not for New Design ]

Description:

National Operating Procedure (NOP) 4.04: Incident Management - Initial Advice and Guidance - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This procedure covers the responsibilities of Network Rail Route Operations Control and other staff involved in the management of incidents on or affecting the railway infrastructure.

PURPOSE

This procedure provides instruction and guidance on the effective management of any incident occurring on or affecting the rail network.


Edition : 1
File Size : 1 file , 950 KB
Number of Pages : 36
Published : 09/02/2017

History

NR NR/L3/OPS/045/4.04 ISSUE 2
Published Date: 11/06/2021
National Operating Procedure (NOP) 4.04: Incident Management - Initial Advice and Guidance
$18.6
NR NR/L3/OPS/045/4.04 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 4.04: Incident Management - Initial Advice and Guidance - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6

Related products

NR NR/CIV/SD/684 ISSUE D
Published Date: 12/01/2018
Infilling of Arch Underline Bridges - Generic Details for Infilling Works
$5.7
NR NR/CIV/SD/FORMA/550 ISSUE B02
Published Date: 01/14/2010
Form A: Standard Tunnel Details - Sprayed Concrete Tunnel Renewal
$18.6
NR NR/L2/SIG/19807 ISSUE 3
Published Date: 06/05/2010
Prioritisation of Signal Engineering Equipment Defects
$18.6
NR E10161/10 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region: WR Control Table Route And Signal
$5.7

Best-Selling Products

SN-CEN/TS 1007-7:2006
Published Date: 09/27/2006
Advanced technical ceramics — Ceramic composites. Methods of test for reinforcements — Part 7: Determination of the distribution of tensile strength and of tensile strain to failure of filaments within a multifilament tow at high temperature
SN-CEN/TS 1046:2021
Published Date: 06/22/2021
Thermoplastics piping and ducting systems - Outside the building structures for gravity and pressurised systems - Trench installation
SN-CEN/TS 1071-10:2004
Published Date: 07/21/2004
Advanced technical ceramics — Methods of test for ceramic coatings — Part 10: Determination of coating thickness by cross sectioning
SN-CEN/TS 1071-11:2005
Published Date: 10/19/2005
Advanced technical ceramics — Methods of test for ceramic coatings — Part 11: Determination of internal stress by the Stoney formula
SN-CEN/TS 1071-8:2004
Published Date: 09/01/2004
Advanced technical ceramics — Methods of test for ceramic coatings — Part 8: Rockwell indentation test for evaluation of adhesion
SN-CEN/TS 1071-9:2004
Published Date: 02/11/2004
Advanced technical ceramics — Methods of test for ceramic coatings — Part 9: Determination of fracture strain