NR NR/L3/OPS/045/4.06 ISSUE 1 PDF

NR NR/L3/OPS/045/4.06 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/4.06 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 4.06: Station Overcrowding and Special Events

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This procedure covers the responsibilities of Route Operations Control for station overcrowding or special events on or affecting the railway infrastructure.

Network Rail managed stations also have additional mitigations for station response and event plans (see NR/L3/OPS/045/4.19).

PURPOSE

This procedure provides instruction and guidance on the effective management of any station overcrowding or special events on or affecting the rail network.


Edition : 1
File Size : 1 file , 150 KB
Number of Pages : 2
Published : 09/02/2017

History


Related products

NR NR/L3/ELP/27240/NR/DIST C16S ISSUE 1
Published Date: 06/01/2017
Isolation and Earthing of Balfour Beatty TAC1 25kV AIS Switchgear at Paisley TSC
$5.7
NR NR/GN/SIG/CAT005 ISSUE 58
Published Date: 03/04/2023
Index of Network Rail Documents Relating to Signalling and Communications Equipment
$24.3
NR X08510 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Flasher Circuits (for use when an Additional Flasher is required)
$5.7
NR NR/SIN/101 ISSUE 2
Published Date: 08/26/2008
Inspection of Switches to Enable the Management of Flange Back Contact and Residual Switch Opening
$18.6

Best-Selling Products

VDMA 24568
Published Date: 03/01/1994
Fluidtechnik - Biologisch Schnell Abbaubare Druckfluessigkeiten - Technische Mindestanforderungen - GERMAN ONLY