NR NR/L3/OPS/045/4.18 ISSUE 3 PDF

NR NR/L3/OPS/045/4.18 ISSUE 3 PDF

Name:
NR NR/L3/OPS/045/4.18 ISSUE 3 PDF

Published Date:
06/05/2021

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 4.18: Management of Station Security and Crime

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to all Network Rail Managed Stations except St Pancras (Midland Road) Station. This station is covered by the St Pancras International Station arrangements.

Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

The scope includes overall station security encompassing counter terrorism, other criminality and public perception of security.

Purpose

This procedure sets out arrangements for the security of stations. It provides the required leadership and co-ordination through prevention and crime mitigation required by:

• National Railways Security Programme

• Secure Stations Accreditation Scheme

• other security obligations as Station Facility Owner


Edition : 3
File Size : 1 file , 320 KB
Number of Pages : 6
Published : 06/05/2021

History

NR NR/L3/OPS/045/4.18 ISSUE 3
Published Date: 06/05/2021
National Operating Procedure (NOP) 4.18: Management of Station Security and Crime
$7.5
NR NR/L3/OPS/045/4.18 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 4.18: Management of Station Security and Crime
$7.5

Related products

NR NR/L2/SIG/11201/MOD A3-5 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signal Spacing Parameters
$7.5
NR BRS-SM 2252
Published Date: 11/12/1985
Rail Clamp Point Lock Cylinder Mounting Plate Assembly
$5.7
NR NR/L2/TRK/6100/MOD06 ISSUE 3
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: 35mm Adjustable Stretcher Bars
$18.6
NR NR/L3/SIG/10064/GI/D022 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Circuit Diagrams - Colouring
$5.7

Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
$160.5
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
$364.5
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
$274.5
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
$157.5
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
$104.7
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
$104.7