NR NR/L3/OPS/045/5.01 ISSUE 1 PDF

NR NR/L3/OPS/045/5.01 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/5.01 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 5.01: Planned General Inspections and Management of Faults and Defects

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to all common or exclusively controlled areas of Network Rail Managed Stations except:

• St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

• Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

• Areas leased by tenants and other third parties.

NOTE: These areas are the responsibility of the occupier.

PURPOSE

This procedure sets out the process to perform risk based programmed checks of the station premises and any associated faults to minimise risk and provide a safe environment for all station users.


Edition : 1
File Size : 1 file , 240 KB
Number of Pages : 9
Published : 09/02/2017

History


Related products

NR NR/L3/MTC/RCS0216/OT20 ISSUE 1
Published Date: 03/03/2012
Risk Control Manual: Access Improvement using Tarmac
$5.7
NR NR/L3/SIG/10665 ISSUE 23
Published Date: 06/03/2023
Reliability Centred Maintenance of Signalling Equipment
$24.3
NR RT/ETE/5/5/1
Published Date: 03/17/1998
High Current Railway Negative Bonding Connections to Aluminium Busbar
$5.7
NR NR/L2/TRK/001/MOD10 ISSUE 6
Published Date: 12/01/2012
Inspection & Maintenance of Permanent Way: Rail Profile Management
$5.7

Best-Selling Products